浙江省塔山石煤矿山自燃地质灾害治理,是国土资源部2002年矿山环境治理工作的重点项目。
The hazards treatment in Tashan stone coal mine is a Key Item of '2002 Mine Environmental Treatment of The Ministry of Land and Resources.
适用于水电站铁路公路边坡大吨位预应力锚固孔排水孔的施工,以及预防滑坡岩石坍塌等地质灾害治理工程。
It is used to drill heavy duty pretension anchor holes at side slope of water power station, railway or highway projects, as well as drainage holes.
结合一个实际的人工挖孔抗滑桩地质灾害治理项目,介绍了通过有效地加强施工管理,提高工程经济效益的工程案例。
A practical man-dug hole slippery-proof pile geological control project is taken to introduce the effective construction management and improvement of economic benefits.
应用推荐