在作业加工时间简单线性恶化下,提出作业的非负开始和停止延迟恶化率,构造了满足约束条件的复合作业。
Under the simple linear deteriorating, nonnegative start and stop lag deteriorating rates are introduced so as to combine jobs and construct composite jobs satisfying precedence relations.
最佳在设备、加工PC板材的工程毕竟,查验作业的时分,再将维护膜掀开。
Best in equipment, processing of PC board, after all, check the homework, then lift maintenance film.
在允许作业柔性加工的基础上,本文提出一种新的两目标机器加工排序问题。
In this paper, we propose a new machine process sequencing problem with two objectives considering the operation flexibility.
应用推荐