土方量的计算是建筑工程施工的一个重要步骤。工程施工前的设计阶段必须对土石方量进行预算,它直接关系到工程的费用概算及方案选优。
The application of GPS technology was evaluated by the measured elevation data and estimated earthwork quantity. The statistic analysis was applied for elevation data at the fixed points measured by GPS and level respectively.
根据测量的田面高程数据和估算的平地土方量,对GPS测量技术的田间应用效果进行评价,利用统计方法对比分析定点GPS与水准仪测量的高程数据,初步探讨车载行进速度对GPS测量精度的影响,分析采用GPS技术替代人工水准仪测量方法的可行性。
参考来源 - 期刊学术社区·2,447,543篇论文数据,部分数据来源于NoteExpress
本文得到的公式同样适用于工程上的土方量及断面面积的计算。
The formulas provided in this paper are also suitable for the computation of the earthwork volumes and profiles.
应用最小二乘法,研究了建筑场地平整土方量的优化计算,并以实例说明该法是实用可行的。
In this paper, using method of the least squares, optimized calculation of earthwork for leveling up construction site is discussed.
有时候,尽管球场作为整体的最好解决方案或许要求几个道的土方量较大以便与其他球道衔接。
Sometimes, though, the best solution for the course as a whole may require major earthmoving on a handful of holes to connect the others.