以三、四、八支柱发射台作为算例,进行了具体应用,同时还与有限元计算结果进行了比较。
The computing method is applied to three strut, four strut and eight strut launching stands, and the result is compared with that of finite element method.
研究结果对城市桥梁现行的独柱式四桩承台设计方法的改进具有一定的指导意义。
The test results provided us with guidelines for proper design of single columns supported by four pile cap used in bridge construction.
结构为四柱导向,上压式,双油缸加机械平衡系统,保证了上下工作台之间的平行度。
The structure is four - pillar guide, up - packing, doublecylinder and machine balancing system. ensures the parallelism of upper and lower working sides.
应用推荐