The single-objective dynamic transmission planning model and multi-objective dynamic transmission planning model are both built, based on Chapter 3 and Chapter 4. The ordinal optimization and vector ordinal optimization are both extended to solve them respectively.
建立了分别考虑发电厂商、输电网所有者以及用户利益需求的多目标静态规划模型,并采用向量序优化求解。
参考来源 - 电力市场环境下输电网规划建模及求解方法研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应用推荐