建设项目中防治水污染的设施,必须与主体工程同时设计,同时施工,同时投产使用。
The facilities for prevention and control of water pollution must be designed, constructed and put to use or into operation simultaneously with the main part of a construction project.
第四十一条建设项目中防治污染的设施,应当与主体工程同时设计、同时施工、同时投产使用。
Article 41. Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.
第二十六条跥建设项目中防治污染的设施,必须与主体工程同时设计、同时施工、同时投产使用。
Article 26. Installations for the prevention and control of pollution at a construction project must be designed, built and commissioned together with the principal part of the project.