本合同的任何补充、变更和修改应当以书面方式进行,于双方授权代表共同签字之日起生效。
Any additions, changes and modifications should be carried out in writing to this contract, authorized representatives of both parties effect the date of signature.
工程变更也就是合同变更,是指对合同中的工作内容作出修改,或者追加或取消某一项工作。
The engineering modification is also the contract modification, which means that some modification, superaddition or canceling is done in content of contract.
工程变更是指由于设计文件或技术规范修改而引起的合同变更,它对工程造价管理工作有较大的影响。
The change of project refers the changes of contract caused by the modification of design document or technical specifications, which has great impact on the work of project cost management.
应用推荐