该方法有助于快速找出可能影响到核电厂调试工期的因素,进而采取有效措施对调试工期进行优化。
This will help the plants to realize the aspects which affect the time limit of commissioning quickly. Then effective measures to optimize the time limit of commissioning can be found.
针对施工期地震或洪水发生时可能造成的损失,本文从经济损失、人员伤亡、工期延误、环境影响四个方面进行了考虑。
As of the costs caused by earthquake or flood during construction, four kinds of losses are considered, they are: economic losses, casualties, construction delay and environmental impact.
施工期荷载较重可能在施工过程中对结构产生影响,进而影响结构发生早期破坏。
Heavy loads during construction period may have an impact on the structure, thereby affecting early damage of the structure.
应用推荐