而且只需上述费用的一小部分,就可在附近的卡贾基大坝建一座大型水力发电厂,应该足以为坎大哈提供照明用电。
And a big hydropower plant at the nearby Kajaki dam should be able to light up Kandahar for a fraction of the cost.
城市温度过高,使得能耗的费用越来越昂贵,同时也加大了电力公司的负担。因此,发电厂不得不更多地燃烧煤炭,石油和天然气来产生电能,污染物也随之产生。
Hotter temperatures lead to higher energy bills and a larger draw on the utilities and greater production of pollution from coal, oil, and natural gas fired power plants.
火力发电厂的发电成本主要是煤耗,球磨机的运行费用只是发电费用中的一小部分,所以本文没有做风险分析和敏感性分析。
The main cost of thermal power plant chiefly is the coal consumption, and the operating cost of ball mill is only the one small part . It is not necessity to do risk and sensitivity analysis.
应用推荐