在某些情况下,装货和卸货作业,只是太困难。
In some cases, loading and unloading operations were simply too difficult.
是否所有负责液货卸货人员了解当惰气系统故障时,应停止卸货作业,并通知卸货站人员?
Are all the persons in charge of cargo operations aware that in the case of failure of the Inert Gas Plant, discharge operations should cease and the terminal be advised?
装卸货计划中是否已经清楚地说明作业货舱,是否标明作业次序及每次作业货舱转移的货物等级和吨数?
Have the holds to be worked been clearly identified in the loading or unloading plan, showing the sequence of work, and the grade and tonnage of cargo to be transferred each time the hold is worked?
应用推荐