建立北京奥运建设综合信息系统,协调指挥全市奥运工程建设。
Establish comprehensive information system for the Olympic construction in Beijing, and coordinate commands over all the Olympic project construction throughout the city.
因为搬家公司并不知道很多细节,这些都需要你来帮助协调指挥。
Because of the moving company does not know a lot of details, these need you to help to coordinate the command.
采取预防措施抓好安全设计、安全评审、统一协调指挥,控制风险、确保爆破安全。
Using forecast method must do better safety design, safety assess, unify harmony direction, so can control risk and insure blasting safety.
应用推荐