汛期分期研究是实现电站、水库动态汛限水位调度控制的基础。
The research on flood season staging is the foundation of scheduling control on dynamic flood limit water level of power stations and reservoirs.
在此基础上,首次提出了动态汛限水位过程线的基本概念与确定方法。
On this basis, the concept of variable process curve of reservoir's restricted water level and its determining method are proposed.
在此基础上,联合降雨预报和洪水预报确定了桓仁水库动态控制汛限水位的上限。
Combined with precipitaton forecast and flood forecast, the upper bound ofdynamic control on limit water level of Huanren Reservoir in flood season was determined.
应用推荐