该工程包括水库(含大坝),取水泵站、输水管道、净水厂、隧洞、调节水池、加压站等,较完善。
This project consists of reservoirs (including DAMS), water intake pumping stations, pipe laying, water purifying plant, tunnels and caves, adjustment cisterns, hydraulic stations ect.
主要论述了一次水加压直供空调水系统的形式、工作原理及工况分析;通过控制膜流状态确定溢流回水管管径;
The forms of primary flow pressurized direct connection of air conditioning system, operational principle and condition analysis are discussed.
应用推荐