该模型的初始产量和初始累计产量为零;
The original production and the original cumulative production of the model is zero.
该项目最重要的目标是以小于初始产量成本40%的费用获得大于60%的初始产量。
The overriding objective of the project is to gain back more than 60% of the IP while spending significantly less than 40% of the IP costs.
为此,建立了预测塔里木油田单井初始产量的数值模拟方法,研制了预测初始产量的数值模拟软件。
So, numerical simulation to forecast individual well initial productivity of Tarim oilfield has been formed and reservoir initial production numerical simulation software has been developed.
应用推荐