根据实际负载进行冷却器、锅炉、水泵、冷却塔设备的运作。
Operate chillers, boilers, pumps, cooling tower equipment in accordance with actual loads.
改造包括改进催化剂质量,更换酸塔填料,扩大酸冷却器和冷却塔。
The quality of catalyst and the packing in the acid towers is to be changed. The acid coolers and cooling tower are to be increased in size.
为了提高直接蒸发冷却器的换热效率,寻求一种新型填料——冷却塔用多孔陶瓷填料,并对其进行实验研究。
In order to improve the heat exchange efficiency on direct evaporative cooler, finds a new filler, called porous ceramic filler which is used in cooling towers, and does experimental study.
应用推荐