通过对两个例子模拟结果和板料应力应变的分析,总结出了工艺预冲孔设置的一些规律。
Some rules of processing pre-punched hole setting are summarized through the simulated results of two instances and the analysis of stress and strain for sheets.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...
应用推荐