在构建的末尾阶段,待完成工作应该降低到零,解决方案在功能方面应该能够全部完成,从而产生一个最初的发布候选者。
By the end of the Construction phase, the Backlog should be reduced to zero and the solution should be functionally complete, resulting in an initial release candidate.
不过,最初的开发成本并不是事情的全部,还有其他的后续成本需要考虑,比如应用程序运行的维护成本和硬件成本。
However, the initial development cost is not the entire picture. There are other continuing costs, such as maintenance costs and the hardware costs to run the application.
您永远不知道某人或某台机器会选择怎样浏览您的数据网络,LOD的全部目标就是使得数据能够通过非最初构想的方式轻松使用。
You never know how someone or some machine is going to choose to navigate your Web of data, and the entire goal of LOD is to make it easy to use data in ways that were not originally conceived.
应用推荐