混凝土转换梁采用叠合梁的施工方法,由于先浇混凝土对后浇混凝土的约束,使叠合面产生剪应力。
The concrete transfer beam applies laminated beam in construction, and because of the constraint of earlier pouring concrete to later pouring concrete, shear stress is induced in lamination.
浇指的是浇头原料,如长鱼,腰花,肴肉,碎肉,占肉,牛肉,干丝,素菜等,“面锅里面煮锅盖,先烫浇头再烫筷。”
Pouring refers to the toppings of raw materials, such as long fish, waist, meat, minced meat, meat, beef, dry silk, vegetarian dishes, "pot inside the pot boil, hot toppings and then hot chopsticks."
应用推荐