车间作业调度系统具有很强的产品和工艺关联性。
Workshop task scheduling system has strong relationship between production and technics.
并通过以上的分析,提出了叶片车间作业调度系统的功能需求及原则。
After the upwards analyzing, it presents the function demand of vane workshop task scheduling.
网格资源的动态特性降低了以“推”模式为主的传统作业调度系统的调度效率。
The dynamic character of Grid resources reduces the efficiency of traditional job scheduling system with only"PUSH"scheduling model.
应用推荐