在项目的开始阶段,团队可能编制出一个完成任务所需的估算时间和人力资源的进度安排。
At the start of a project, the team probably compiles a schedule of the estimated time and person resources that will be needed to complete the tasks.
timeron不直接等于真正的消耗时间,但是对数据库管理器所需的资源(成本)给出了一个相对粗略的估算。
A timeron does not directly equate to any actual elapsed time, but gives a rough relative estimate of the resources (cost) required by the database manager.
通过建立能源消费的模型,估算几种矿物资源累积消费和倍增时间、最大消费率及达到的时间。
According to consumption rate models of energy sources, we estimate accumulative consumption of resources, doubling time, maximum consumption rate and the time of maximum consumption rate.
应用推荐