中英
underestimate
/ ˌʌndərˈestɪmeɪt /
/ ˌʌndərˈestɪmeɪt /
  • 简明
  • 柯林斯
  • v.低估,对……估计不足;轻视,小看(某人)
  • n.低估,对……估计不足
  • CET4/CET6/考研/IELTS/GRE/商务英语/
    • 复数

      underestimates
    • 第三人称单数

      underestimates
    • 现在分词

      underestimating
    • 过去式

      underestimated
    • 过去分词

      underestimated
  • 专业释义
  • 英英释义
  • 1

    经济学

    • 估计过低

  • 2

    医药科学

    • 低估

      The state of underestimate the histologic grade is correlated with the location of biopsy,tissue dose and the conser- vation of pathology judgment.

      低估原因可能与活检钳取部位、组织量以及病理判断上的保守等相关。

  • 3

    地球科学

    • 低估

  • 双语例句
  • 权威例句
  • 1
    Don't under-estimate the value of utilizing proven, successful marketing tactics when it comes to marketing your products.
    不要低估行销您的产品的时候利用经验证的、成功的市场行销策略的值。
  • 2
    This is not to belittle or under-estimate Wenger's latest achievement. He is a fantastic manager whose team is a glowing testament to his managerial ability.
    这并非贬低或者低估温格最近的成就,他是个非凡的教练,他的球队就是他的执教才能的闪亮证明。
  • 3
    Even the new figure could be an under-estimate, the team suggests, because it doesn't account for the full range of positive feedbacks, such as melting permafrost releasing methane and carbon dioxide.
    研究小组指出,就连这个数字也可能估计不足,因为它没有解释正反馈的方方面面,比如释放出甲烷和二氧化碳正在融化的永久冻土层。
查看更多
  • 百科
  • Under-estimate

    A cost overrun, also known as a cost increase or budget overrun, involves unexpected costs incurred in excess of budgeted amounts due to an underestimation of the actual cost during budgeting. Cost overrun should be distinguished from cost escalation, which is used to express an anticipated growth in a budgeted cost due to factors such as inflation.Cost overrun is common in infrastructure, building, and technology projects. For IT projects, a 2004 industry study by the Standish Group found an average cost overrun of 43 percent; 71 percent of projects came in over budget, exceeded time estimates, and had estimated too narrow a scope; and total waste was estimated at $55 billion per year in the US alone.Many major construction projects have incurred cost overruns; cost estimates used to decide whether important transportation infrastructure should be built can mislead grossly and systematically.

查看更多