高切坡稳定性评价是一典型的半结构化问题。
The stability evaluation of artificial high slope is a half-structure problem.
高切坡是人类工程活动对自然斜坡的改造而形成的人工陡坡。
The high cut slope is the artificial steep slope transformed from natural pitch through human project activity.
该文介绍了格构锚固的特点、结构机理及其在高切坡防治中的应用。
Framed anchor features, structure mechanism and its application in controlling high cutting slope are introduced in the paper.
根据两巫公路K 95段高切坡的实际情况,运用ANSYS软件对其开挖过程进行了模拟。
According to the actual condition of high-cutting slope of Wushan-Wuxi Road K95 section, general-purpose finite element program ANSYS is used to simulate excavation process.
根据两巫公路K 95段高切坡的实际情况,运用ANSYS软件对其开挖过程进行了模拟。
According to the actual condition of high-cutting slope of Wushan-Wuxi Road K95 section, general-purpose finite element program ANSYS is used to simulate excavation process.
应用推荐