在验收测试期间,考虑工件产品的产品验收计划是很重要的。
It is important to take the artifact Product Acceptance Plan into account during the AT.
我们认为我们在验收计划中指出使用测试脚本的意图是非常清楚的,但是现在我们意识到我们在计划中的措词是含糊不清的。
We thought our intention to use the test scripts had been made clear in the acceptance test plan, but we now realized our wording in that plan was ambiguous.
“尽管没通过感官分析来引起特别养护,但对于计划工程验收工作依然有利”,剑桥大学的Frank Stajan说。
"While no extraordinary maintenance was triggered by the sensor analysis, it was nonetheless useful for planning engineering inspections," says Frank Stajano of the University of Cambridge.
无论如何,主测试计划需要确保,系统测试和验收测试是有关测试覆盖的补充。
In any case, the master test plan needs to ensure that the st and at are complementary with regard to test coverage.
试验程序将包括关于每一台设备和整个系统试验的计划、进度、程序、登记表、验收表、试验表、试验项目和故障排除程序。
The test procedure will include plans schedules procedures log sheets acceptance forms test sheet test item and fault correction procedures on tests of each equipment and entire system.
交付的船舶将发生在今年八月前,海港和海上验收试验计划。
The ship will undergo Harbour and Sea Acceptance Trials before the planned delivery in August this year.
前两种检验,一般是根据验收抽样计划实施的;
The first two tests, generally based on acceptance sampling plan implemented;
根据需求和计划的设计验证系统:可以根据需求模型定义验收测试或系统测试。
Validate your system with the requirements and intended design: Define acceptance tests or system tests based on the requirements models.
验收时,供应商应向南京乐购提交同工具相关的一切必要文件、计划等。
Upon ACCEPTANCE SUPPLIER shall deliver all necessary documents, plans etc. relating to the TOOLS to BUYFUN Nanjing.
它包括制订计划-计划论证-设备采购-验收入帐-日常管理-报废出帐等相互关联的内容。
It involves relative contents including plan making and demonstrating, equipment purchasing, checking and account entering, equipment daily managing, discarding and expenditure account entering, etc.
负责动力设备零备件及材料计划,到货验收及保管。
In charge of management on spare parts for all utility equipment or machines.
该课题于2005年2月通过国家863计划专家组的课题研究验收,一致认为该机器人的机械本体结构设计具有很好的独创性、发明性,完全能够满足巡线的要求。
The inspection robot study has been checked and accepted by National 863 Program experts group in Feb, 2005, which was valuated that it was creative and possessed main functions for inspection tasks.
贯标线按预定计划顺利验收,代表产品通过可靠性等级鉴定试验,达到“L”级。
The standard implementation production Line is approved as scheduled, at the same time its representative products passed reliability grade qualification, achieving "l" level.
贯标线按预定计划顺利验收,代表产品通过可靠性等级鉴定试验,达到“L”级。
The standard implementation production Line is approved as scheduled, at the same time its representative products passed reliability grade qualification, achieving "l" level.
应用推荐