纤维桩:依照厂商说明使用预成钻和完成钻进行根管预备。金属桩:对桩的表面喷砂。
FIBER post: Prepare the root canal with the Pre-Shaping and Finishing drills, according to manufacturer's instructions. METAL post: Sandblast the surface of the post.
纤维桩:依照厂商说明使用预成钻和完成钻进行根管预备。金属桩:对桩的表面喷砂。
FIBER post: Prepare the root canal with the Pre-Shaping and Finishing drills, according to manufacturer's instructions. METAL post: Sandblast the surface of the post.
应用推荐