对驱动轮轮毂原铸造工艺进行凝固模拟,找出缺陷的成因,并对原工艺进行了改进,采用顶置随形压边浇冒口。
The solidification process of a driving wheel hub cast with former foundry method was simulated to find out the reason causing shrinkage defects.
介绍大屏幕彩色电视机前壳注射模结构,重点介绍侧抽芯大滑块的设计, 顶出机构和进浇方法的改进。
The injection mold structure of the front shell of large screen color TV is introduced, and design of side core-pulling large slide, improvement of ejector mechanism and gating method are introduced.
对于中心位置浇口,由于产品顶出后模具配件和浇品处披锋阻碍很难去掉而造成动模与定模不能分开。
In the case of center-positioned gate, moving die is not separated from fixed die due to the interference of the biscuit part and the cutting of gate is ery difficult after pulling out the product.
运用大孔出流理论设计了顶注压边浇冒口系统。
Based on the large orifice discharge theory, the kiss gating system of the casting was designed.
接着,Mickael发挥他的专长,呈现了一道法国的特色菜——朗姆葡萄干冰淇淋顶的小馅饼,上面浇着生奶油和巧克力。
Then, showing his French roots, Mickael presented us with a crepe topped with rum raisin ice cream, whipped cream and chocolate sauce.
在仓面工艺设计中,采用了平浇法和台阶法,同时,更始传统工艺,提出并运用塔(顶)带机新工艺。
On deck in the design process using a water-level law and law at the same time, the reform of traditional crafts, and made use of towers (top) with the new machine technology.
主梁后浇结构层与墩顶梁端湿接头浇筑顺序以及墩顶负弯矩预应力筋张拉顺序是简支变连续梁桥施工的关键工序。
The constructing procedure of the monolithic layer and the wet joints of the girders and the orders of straining the pre-stress force are the key orders of the simply supported-continuous system.
从而解决了桥梁工程施工中的悬浇法连续梁墩顶承重托架施工技术问题。
Therefore, the invention solves the technical problem in the suspended casting construction of the bearing bracket at the top of a continuous pier in bridge construction.
从而解决了桥梁工程施工中的悬浇法连续梁墩顶承重托架施工技术问题。
Therefore, the invention solves the technical problem in the suspended casting construction of the bearing bracket at the top of a continuous pier in bridge construction.
应用推荐