顶架覆盖该间隙部分。
在此基础上,进一步对主桩架结构包括支柱、顶架平台、支座等进行了强度校核验算,并对桩架的运行安全提出了建议。
The main structures with strength checking include the stanchion, the upper platform and the base seat. The suggestions about the safety of the pile driving frame are put forward.
具有升沉补偿顶推架的作用;
模板和顶料格架系统在剖面图上以点划线表示。
The mould plate and ejector grid system is shown in chain-dotted lines in the cross-sectional view.
同时还介绍了两种塔架顶升时的导向方法。
At the same time, this paper also introduces two examples of guiding device of this lifting tower.
本发明公开了一种洁净仓储,包含一储存架体、一顶部空间、通道以及多个第一供气单元。
The invention discloses a clean storehouse, which comprises a storage shelf, a top space, a passage and a plurality of first air supply units.
建筑模板工程施工中,特别是高大支模架体施工中,往往出现扣件式钢管架体顶部可调顶托的悬臂长度过长,导致架体坍塌事故。
During construction of high formwork support frame, collapse accident usually occurs because of cantilever length of adjustable jacking of steel tubular scaffold with couplers.
顶升作业时液压系统应进行空载运转,调整顶升套架滚轮与塔身标准节的间隙,使起重力矩与平衡力矩保持平衡;
Lifting operation hydraulic system should be no-load operation, adjust the lifting sleeve frame roller and the mast section clearance, hoisting torque and balance torque balance;
介绍利用穿心式带载升降液压千斤顶做提升动力的液压爬架的结构构造、操作方法及其特点。
The structure composition method of operation and the feature of the hydraulic climbing scaffolds is described, which are lifted by hydraulic screw jacks with load.
将浴巾环架体用M5的内六角紧顶螺钉固定在底座上。
Fix the Towel Ring on the base with the M5 inner hexangular set screw...
将浴巾环架体用M5的内六角紧顶螺钉固定在底座上。
Fix the Towel Ring on the base with the M5 inner hexangular set screw...
应用推荐