• 适用各种露天开采矿山大型采掘运输联合作业工程

    It is suitable for the engineering of various open - pit mines and large excavating - hauling combined operation.

    youdao

  • 针对露天采掘进度计划优化编制问题,建立了个数学模型,同时较充分地考虑了作业条件下的模型建立和问题处理。

    An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.

    youdao

  • 针对露天采掘进度计划优化编制问题,建立了个数学模型,同时较充分地考虑了作业条件下的模型建立和问题处理。

    An optimized mining plan model was presented for opencast mines. During the development of the model, mining construction was given full consideration.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定