• 身上底部动(以提供抓力)尖端部分

    The pointed part(s) of an anchor that digs into the bottom when the anchor sets

    youdao

  • 经过几年机的跟踪研究,发现围岩作业中常遇到中有夹层的现象,造成施工过程经常更换问题。

    After several years to jumbolter research, the hard rocks always present in the soft ones in the wall rock procedure using jumbolter, which results in changing the boring tool during the procedure.

    youdao

  • 取出之后,将原来10公厘的小12公厘,再将新的设在同样位置

    If appropriate, old 10mm holes should be re-drilled to 12mm and the new bolt placed in the same position.

    youdao

  • 用于墙壁的电

    Drill for drilling wall anchor holes.

    youdao

  • 许多卡事故是由于隔器其他井下工具使用造成,Y 211隔器的卡问题最为突出,且多发生定向井中。

    The sticking of the downhole string happened occasionally because great quantity of packers and other tools with slips are used. The sticking of Y211 packer is frequent in directional well.

    youdao

  • 此时操作液压头,伸出液压钳,扭矩显示液压头绳拉力。

    The driller now operates the EZY-torque. The hydraulic cylinder slides out (up) causing the jack line to be pulled by the rig tong. The torque meter will indicate the torque line pull force.

    youdao

  • 此时操作液压头,伸出液压钳,扭矩显示液压头绳拉力。

    The driller now operates the EZY-torque. The hydraulic cylinder slides out (up) causing the jack line to be pulled by the rig tong. The torque meter will indicate the torque line pull force.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定