• 研究实现基于B/S模式铁路工程形象进度参数化生成系统PIPGS)。

    This paper investigates the design and implementation of project image progress parametric generating system based on B/S model for railway engineering(PIPGS).

    youdao

  • 看到一个进度窗口14

    You should get a progress window, as shown in Figure 14.

    youdao

  • 10展示了在确认选项收到摘要进度更新

    Figure 10 shows the summary and progress updates you'll receive after you confirm the choice.

    youdao

  • 11一个进度标识例子

    Image 11: An example of a progress indicator.

    youdao

  • 18显示迁移完成进度

    Figure 18 shows percentage of progress of migration that has been taken place.

    youdao

  • 2预期项目进度概况

    Figure 2: Expected project progress profile.

    youdao

  • 4进度返工影响

    Figure 4: The impact of rework on progress.

    youdao

  • 考虑一下清单10定义线程线程将更新4中的标签进度块。

    Consider the thread defined in Listing 10, which updates the label, progress bar and the slider in Figure 4.

    youdao

  • 有时称为管理者用它准地知道任何一天工程进度,也能将实际进度计划进行比较

    Bar charts, sometimes known as Gantt charts, allow managers to quickly see exactly where the project is at any given date and compare actual progress with planned progress.

    youdao

  • 计划通常文件不要陷入陷阱例如认为一张甘特横道计划仅仅是一张进度而已。

    Plans are always documents, don't fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.

    youdao

  • 2显示运行一半时进度

    Figure 2 shows the bar in the middle of its run.

    youdao

  • 慕尼黑基尔加特进度最快

    Munich, Kiel and Stuttgart were the fastest.

    youdao

  • 11显示了开发进度定义(Developing Schedule Definition)业务实现业务操作者如何合作实现活动

    Figure 11 shows how the business workers of the Developing Schedule Definition business Use Case Realization cooperate to implement the activity.

    youdao

  • 10显示了三个业务操作者如何实现开发进度定义(Developing Schedule Definition)业务用

    Figure 10 shows how the Developing Schedule Definition business use case is realized in terms of three business workers.

    youdao

  • 红色箭头表明出自于7开发进度定义(Developing Schedule Definition)业务支持运作管理人员设定的业务目标

    The red arrow shows that the Developing Schedule Definition business use case from Figure 7 supports the business goal that is set by the Operations Manager.

    youdao

  • 如果工作区现有当前工作性能进度添加配置位置那么单击addExisting(2)。

    Click add existing (figure 2) if you have existing locations in your workspace that you want to add and configure to the current working performance schedule.

    youdao

  • 然后进度条会移动至100%,而且添加至脚本中的ExecutionComplete信息(28)。

    The progress bar moves to 100%, and an "Execution Complete" message is added to your script (Figure 28).

    youdao

  • 已经执行步骤做好准备时,点击ApplyResultforStep1完成检查而且执行进度会移动至50%(27)。

    When you are ready to execute a step, click the Apply Result for step 1 gets checked off, and the execution progress bar moves to 50% (Figure 27).

    youdao

  • 根据修改过的展示已达成进度

    Show the progress achieved by reference to a revised time chart.

    youdao

  • 3详细描述批量进度开发(Batch andSchedule Development)业务流程(2红色箭头标出的)。

    Figure 3 details the Batch and Schedule Development business process (highlighted by a red arrow in Figure 2).

    youdao

  • 25 - 4这一个典型警告对话框,不仅不必要不恰当,而且愚蠢打断进度

    Figure 25-4: a typical alert dialog box. It is unnecessary, inappropriate, and stops the proceedings with idiocy.

    youdao

  • 提出核工程质量进度集成控制网络计划技术及其网络模型,介绍了该网络计划的编制和使用方法。

    The network planning technique and its' network model is presented for nuclear project quality and schedule integration control.

    youdao

  • 每个提供一个区域,该指定持续时间估计工作量,绘制已完成工作进度

    Each view provides an area graph that charts the progress of completed work against the total estimated work for the specified time duration.

    youdao

  • 流程将于选定专题发下,大致描述专题如何学期进度开展

    While choosing project assignments, a flowchart is provided as a general description of how the project may unfold as the semester progresses.

    youdao

  • 其中立体方式方法提高精度的关键,关系整个工程进度和质量。

    In the industry of stereo mapping the way and the method is the key to improve the accuracy, which is related to the progress and quality of the whole project.

    youdao

  • 24 - 5微软这个进度基本上是正确的。

    Figure 24-5: Microsoft got this one mostly right.

    youdao

  • 施工设计包括清单工程量计算、工程量清单报价(商务)、施工技术标、施工进度计划施工平面编制

    Construction design includes: a list of projects in terms of Quantity Price (Business standard), standard construction techniques, construction schedule and construction plan preparation.

    youdao

  • [摘要]工程施工进度网络计划基础提出绘制施工进度计划综合思路绘制步骤

    Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.

    youdao

  • 对于进度风险分析可用优先顺序法(PDM)进度

    The progress of risk analysis can be used in the order of priority Library (PDM) progress.

    youdao

  • 对于进度风险分析可用优先顺序法(PDM)进度

    The progress of risk analysis can be used in the order of priority Library (PDM) progress.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定