• 经过反复论证,2004年冷床输入辊道入口处增加了一台提速拨板装置,将轧件分开解决了这个难题产能得到了释放。

    A increasing speed acting unit was added by Author at the cooling bed entrance in 2004, in order to separate head from tail. The bar production was increased much because of solving this big problem.

    youdao

  • 经过反复论证,2004年冷床输入辊道入口处增加了一台提速拨板装置,将轧件分开解决了这个难题产能得到了释放。

    A increasing speed acting unit was added by Author at the cooling bed entrance in 2004, in order to separate head from tail. The bar production was increased much because of solving this big problem.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定