并介绍施工中采用的ZY及超长结构不设缝工艺和复合塑料防水板工艺。
Two techniques during the construction are introduced including ZY over-long structure without joint and complex plastic sheet.
重庆国际机场航站楼候机指廊工程预应力混凝土超长结构设计中,综合考虑了各方面因素;
In the design of the ultralong prestressed concrete structure of the waiting corridor project of airport buildings of Chongqing International Airport, engineers comprehensively considered all factors.
为了进一步了解温度对超长混凝土结构应力的影响,对超长结构的温度应力问题的基础性研究是非常有必要的。
In order to further understand the temperature on the long concrete structure stress the impact of stress on the structure of the temperature of super-long stress of basic research is necessary.
温州市会议中心为一有一层地下室的现浇钢筋砼框架结构,该建筑位于典型软土地区、荷载大并且为超长结构。
The conference center of Wenzhou is a framework structure of cast in place reinforced concrete with one floor basement. It lies on the typical soft soil with huge loads and it is extra long.
根据工程施工实践,总结在超长混凝土结构中采用加强带代替后浇带的原理和施工工艺措施。
According to the construction practice, it summarized the principle of reinforcing band of the super-long concrete structure and the construction process.
对于超长钢筋混凝土框架结构,变温的作用常常导致混凝土梁和楼板的开裂。
For over-long reinforced concrete frame structure, temperature loading often leads to crack formation of the beams and plates.
大跨度超长薄壁构件的预应力拱形屋盖是将室内顶棚与屋面板两者合一的新型结构。
The large span and over long and thin wall and prestressed arch roof is a new type structure of combining indoor top and roof plate.
对钢筋混凝土结构的裂缝控制实现超长设计的分析和设计对策,经过工程验证,达到了预期的效果。
The crack control methods of analysis and design in the super-length reinforced structure have been tested in the project, and reached the effect to be hoped.
结合一具体工程介绍了超长混凝土结构的现场监测问题。
The site test of super -length concrete structure is introduced in detail.
超长钢筋混凝土结构温度应力分析一直是设计人员所关注的课题。
Analysis of temperature stress in the super-length reinforced concrete structure is one of the most important problem to the engineers.
所以对超长混凝土结构温度应力的分析并研究其有效的控制技术具有重要的意义。
So it is important to analyze the temperature stress and research its valid control technique of this structure.
混凝土结构中经常遇到超长的问题,本文就混凝土结构超长的温度缝和沉降缝是否均可设后浇带解决的问题,阐述了自己的观点。
This paper states the viewpoint that the exceeding long temperature crack and settlement crack in concrete structure can be solved by later casting zone.
结合一具体工程介绍了复杂平面、超长跨度的框架结构温度应力的测试工作及计算分析。
The test and calculation analysis of temperature stress of a frame structure with complex plane and super-length span are introduced in detail.
本文结合聊城人民医院大楼工程,重点介绍大体积超长混凝土结构的冬季无缝施工技术。
Combined with the case of Liaocheng Peoples Hospital Building Project, this paper emphasized on winter seamless construction technique of mass and over-length con.
介绍了以补偿收缩混凝土为结构材料、以加强带连续浇筑超长钢筋混凝土结构的设计与施工方法。
This paper introduces the design and construction method to use die construction material of constringency concrete with construction of over long reinforced concrete.
针对筒体、滚圈结构重复性强的特点,基于多重子结构技术,建立了超长筒体与滚圈三维多体接触模型;
According to the high iterative feature of shell and tyre structure, the multi_level substructure technique is adopted to set up the multi_body contact model between tyres and long shell.
基于弹性理论,对超长筒体结构中环向预应力的建立与分布进行了研究。
Based on the elastic theory, the establishment of super-long tubes of ring pre-stress was studied.
结果表明,天然气勘探开发中的重大发现井,一旦出现井控严重失控,且存在井身结构及工程缺陷时,需要打超长的水泥塞封井。
The results have indicated that major gas discovery Wells need to be closed by a long cement plug if they are heavily out of control and have shortcomings of hole structure and engineering.
确定预应力筋布索方案是超长预应力混凝土结构设计的一项关键内容。
The tendon disposition option is an important part in the design of extra-long post-tensioned concrete frames.
希望本文能对超长混凝土结构裂缝的研究及控制起到一定的指导意义。
I hope this paper will have certain guiding significance to the study on the over-long concrete structure cracks.
提出一种用于超长跨距无中继光传输系统的结构。
A novel structure for ultra long span optical transmission systems is proposed.
探讨超长预应力混凝土结构预应力后浇带常用设计方法,指出其不足之处。
Design methods currently dealing with prestressed post-poured strips of prestressed concrete structures with large longitudinal length are discussed and problems are put forward.
研究了在日照温差作用下超长高层建筑结构的温度效应计算问题。
It is discussed that the calculation of the effects of the difference of temperature caused by sunlight on super-long tall buildings.
探讨了极端温差对超长高层建筑结构的影响问题。
The effects caused by the extreme difference in temperature on super-length tall buildings are discussed.
鉴于这种情况,裂缝成为超长混凝土结构亟待解决的问题。
Given this situation, the crack becomes the question which the over-long concrete structure urgently awaits to be solved.
芯片使用可重构体系结构和超长指令字(VLIW),优化了高复杂度函数。
The chip USES a reconfigurable architecture and very long instruction words (VLIW) to optimize the complex functions.
本文介绍了一种结构独特,可显示拔制负荷的新型超长三线冷拔机。
A new over-long pipe cold drawing mill with three pipes drawn simultaneously, which has an unique structure and a display device for drawing load, is described.
本文介绍了一种结构独特,可显示拔制负荷的新型超长三线冷拔机。
A new over-long pipe cold drawing mill with three pipes drawn simultaneously, which has an unique structure and a display device for drawing load, is described.
应用推荐