安静地,他改变了来自钩点和线的武器负荷居住军火,然后在女人的脸沿著视力凝视。
Quietly, he changed the weapon's load from hook point and line to live ammunition, then peered along the sight at the woman's face.
解决大瓦斯线结焦是延长焦化装置生产周期,确保高负荷加工劣质原料的关键手段之一。
Solving this problem is helpful to prolong the working cycle of the delayed coking equipment and insure treatment of low quality material in high load.
其次对模糊理论及模糊控制进行了综述,接着介绍了电解清洗线计算机控制的系统设计,并设计了刷辊的电流负荷模糊控制系统。
Secondly, fuzzy theory and fuzzy control is introduced generally. Then, the computer control system of electrolytic cleaning line and brush roll motor current load fuzzy control system are designed.
临界负荷主要取决于到发线数量和驼峰作业时间变异系数。
Critical load is mainly determined by the number of receiving and departure track and coefficient of variation of hump-working time.
影响负荷分布性的加工误差主要因素是齿向误差和接触线误差。
The machining error affecting the load distribution are errors of the tooth flank direction and the contact line.
本文介绍了一种结构独特,可显示拔制负荷的新型超长三线冷拔机。
A new over-long pipe cold drawing mill with three pipes drawn simultaneously, which has an unique structure and a display device for drawing load, is described.
重心线调节法可应用于高负荷叶片设计。
Gravity center modification method can be used in high-load rotor blade design in engineering.
在加有轮胎纵向刚度测试附加装置的轮胎静负荷试验机上测试了轿车子午线轮胎的静态纵向刚度。
The static foreaft stiffness of radial car tire was measured by a tire static load tester with additional tire foreaft stiffness testing device.
根据不同置信度的期望负荷为配电网匹配潮流提供负荷数据,在进一步利用冗余信息修正负荷的基础上,得到了理论线损计算结果。
In addition, the obtained expected loads with different confidence provide load data for matching power flow method, on the basis of further modifying the load the theoretical line loss is calculated.
在水电站机组丢弃负荷情况下,利用特征线法计算管道内的水击荷载时间历程。
The time history of water hammer in pipeline in the condition of unit emergency load dump is calculated by characteristic line method.
生产线的平衡可以通过负荷的优化分配来实现。
Optimal line balance may be reached with optimal load distribution.
大油气线结焦是影响延迟焦化装置生产负荷和生产周期的重要因素,也是延迟焦化技术面对的普遍问题。
Oil gas line coking is an important factor affecting the production load and period of delayed coking plant, which is a very common problem for delayed coking production.
一种是较低热负荷下的单一的微槽内三相接触线附近薄液膜区域中薄液膜的高强度蒸发换热机制(纯蒸发模式);
One of them is pure evaporation heat transfer model in the extended thin film region near the triple-phase contact line of vapor-liquid-solid at lower input heat flux.
介绍了尼龙66纺丝工艺对工业丝物理性能如线密度、强力、定负荷伸长率的影响。
The effects of spinning process on linear density, tenacity and elongation of Nylon 66 technical yarn were described.
介绍了使用线稳定指标作为快速电压稳定指标(FVSI)确定电力系统母线的最大承载负荷的方法。
This paper demonstrates the use of line stability index termed as fast voltage stability index (FVSI) in order to determine the bus maximum loadability in a power system.
针对当前零序功率方向元件带负荷试验的不足之处,讨论了如何检查“L”、“N”及“S”线的接线正确性。
How to check the connection correctness of "l", "n", "s" lines is discussed on the shortcomings of on-load test for zero-sequence power direction component.
改造结果显示,装配线各工作站作业负荷趋于均衡,整体生产效率得以提高,改造效果明显。
According to the results of improvement, workload of the stations becomes more balanced and productivity gets improved, the effect of the improvement is evident.
本文对大负荷容量架空输电线紧线器设计中的可靠性问题作了深入讨论。
In this paper, the reliability problem in designing the mounting strain clamps with large load capacity for overhead power transmission lines are investigated.
分析了抽油机的负荷特性,提出一种改进的油田配电网理论线损计算方法。
This paper analyzes the loading behaviors of oil pumps, and suggests a kind of improved method to calculate theoretical line loss of power distribution networks for the oil fields.
重心线调节法可应用于高负荷叶片设计。
Gravity center modification method can be used in high-load rotor blade design...
作用于平行轴承轴心线方向的负荷。
Acting on the bearing axis line parallel to the direction of the load.
作用于垂直轴承轴心线方向的负荷。
Acting on the vertical axis line direction of load bearing...
针对已安装配电负荷测试仪的配电网线路,本文提出了计算线损的电流分配系数法。
Based on the load survey instrument, a new method of allocating current coefficients to calculate energy losses is put forward in this paper.
该方法充分地利用了现有所能得到的电网运行数据,对其重新进行整理,根据持续负荷曲线进行线损计算,得到更加精确可信的结果。
It fully USES the available power network data and rearranges it. More accurate and convincing result can be obtained from the line loss computation based on durative load curve.
角接触球轴承,轴承的负荷,在一定的角度,-所谓的“接触”轴心线(参见下图)的角度转移。
Angular contact ball bearings transfer the loads acting on the bearing at a certain Angle, the so - called "contact" Angle from the shaft centre line (see sketch below).
圆锥滚子轴承的负荷作用于轴承在某一个角度,即所谓的阿尔法对轴中心线的接触角,(参见下图)转移。
Taper Roller Bearings transfer the loads acting on the bearing at a certain angle, the so called alpha contact angle towards the shafts centre line, (see sketch below).
浮法玻璃生产线是一级用电负荷,供电可靠性严重影响到生产线的正常运行和经济效益。
The float plate glass production line is the first level load of power supply. The power supply reliability affects seriously the normal operation and the economic efficiency of the production line.
下面金属线,携带电力负荷,因此防御闪电,闪电可能切断电流或损坏设备。
Lower wires, which carry the power load, are thereby protected against lightning, which might shut off the current or damage equipment.
下面金属线,携带电力负荷,因此防御闪电,闪电可能切断电流或损坏设备。
Lower wires, which carry the power load, are thereby protected against lightning, which might shut off the current or damage equipment.
应用推荐