开始蓄水拦沙运用 ,水库严重淤积回水迅速上延 ,引发设计输沙量和水沙综合调节治河新理论。
Therefore it also brings out new river-trained theory of design sediment load and integrated regulation of water-sediment.
淤地坝系规划阶段水文计算的主要任务是计算设计暴雨量、设计洪水量和输沙量等重要特征参数。
In the stage of planning silt dam system, the main task of hydrological computation is to design rainstorm, design flood and sediment load and other important characteristic parameters.
淤地坝系规划阶段水文计算的主要任务是计算设计暴雨量、设计洪水量和输沙量等重要特征参数。
In the stage of planning silt dam system, the main task of hydrological computation is to design rainstorm, design flood and sediment load and other important characteristic parameters.
应用推荐