• 开始蓄水拦运用 ,水库严重淤积回水迅速上延 ,引发设计输沙量水沙综合调节治河理论

    Therefore it also brings out new river-trained theory of design sediment load and integrated regulation of water-sediment.

    youdao

  • 淤地坝规划阶段水文计算主要任务计算设计暴雨量设计洪水量输沙重要特征参数

    In the stage of planning silt dam system, the main task of hydrological computation is to design rainstorm, design flood and sediment load and other important characteristic parameters.

    youdao

  • 淤地坝规划阶段水文计算主要任务计算设计暴雨量设计洪水量输沙重要特征参数

    In the stage of planning silt dam system, the main task of hydrological computation is to design rainstorm, design flood and sediment load and other important characteristic parameters.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定