• 对组芯工艺自动循环装置进行了研制。

    The research development of automatic cycling equipment for core assembly process is carried out.

    youdao

  • 介绍了缸体、缸盖组芯立浇工艺的特点。

    The features of cylinder block and cylinder head core assembly vertical casting process are introduced.

    youdao

  • 对气缸体组芯夹具的各种设计结构进行对比分析。

    Various design constructions of cores assembling jig for cylinder blocks was compared and analyzed.

    youdao

  • 对夹具结构、夹具本体、轴箱芯定位机构、水套砂芯组芯小车及夹具支架的设计优化进行了讨论。

    The design optimization of jig construction, jig body, locating mechanism of crank case cores, jacket cores assembling vehicle and jig supporter was discussed.

    youdao

  • 详细介绍了采取顶注式浇注系统、成形外冷铁、复合铸型、组芯造型的铸造工艺,成功地生产出批量铝叶轮。

    The casting technique with top gating system, outer shaped iron chill, compound casting mold and core assembly molding was used for producing aluminum impeller on a large scale successfully.

    youdao

  • 介绍了NHR -10组件内钆可燃毒物配置、堆芯燃料组件布置和换料方案的改进设计。

    This paper introduces the improved NHR 10 core design which includes the arrangement of the gadolinium burnable poison (BP), the fuel assembly arrangement and the fuel assembly reloading scheme.

    youdao

  • 福岛第一核电站有六组核反应堆发电机组,有些处于稳定状态,有些则不同程度发生堆芯熔毁的情形。

    The Fukushima Daiichi power plant has six nuclear reactors. Their status ranges from being stable to having varying degrees of core meltdown.

    youdao

  • 底部面板包含一个集成的6芯锂聚合物电池组。

    The bottom panel contains an integrated 6 cell Li-Polymer battery pack.

    youdao

  • 综合运用地震、测井、岩芯及分析化验资料,在西湖凹陷平湖组发现潮汐砂脊沉积体系。

    Through comprehensive application of cores, logs and seismic data, tidal sand ridges are discovered in Pinghu Formation, Xihu Depression.

    youdao

  • 通过对野外剖面及岩芯的观察和描述,将鄂尔多斯盆地安塞地区延长组划分出9个岩石相和6个岩石相组合。

    According to the outcrops observing and the cores describing, Yanchang formation has been classified 9 petrology facies and 6 petrology facies units.

    youdao

  • B2组行双侧股骨头多孔髓芯减压术治疗,B1组未进行任何治疗处理。

    The multiple core decompression was performed bilaterally in group B2. Group B1 had no treatment.

    youdao

  • 在CANDU - 6堆中应用CANFLEX组件替代目前的NU - 37组件不会影响堆芯功率分布和峰值,功率波动幅度变化也很小。

    Replacing the NU-37 assembly by CANFLEX in CANDU-6 reactor will not have influence on the in-core power distribution and peaking power and the power fluctuation as well.

    youdao

  • 运用地质、测井、地震及岩芯等综合方法,对福山凹陷下第三系流沙港组的沉积体系进行了研究。

    Through composite method of geological, log, seismic and core analyses, depositional system of Eogene Liushagang Fm in Fushan sag has been studied.

    youdao

  • 运用地质、测井、地震及岩芯等综合方法,对福山凹陷下第三系流沙港组的沉积体系进行了研究。

    Through composite method of geological, log, seismic and core analyses, depositional system of Eogene Liushagang Fm in Fushan sag has been studied.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定