• 组合梁弹性稳定性进行分析

    Analysis on the elastic stability of the composite beams.

    youdao

  • 钢-混凝土组合梁基本构件之一。

    Steel-concrete composite beam are its basic members.

    youdao

  • 工程上组合梁吊车设计具有实际意义。

    And it can be used for designing composite i-beam and i-typed crane beam.

    youdao

  • 研究了蜂窝式混凝土组合梁计算方法

    The calculating method of high haunched honeycomb steel concrete composite beam is presented.

    youdao

  • 主梁采用钢管混凝土桁架钢筋混凝土组合梁

    The main beam adopts the CFST truss and reinforced concrete deck slab.

    youdao

  • 研究了肋腹板连续组合梁横向连接刚度强度

    The strength and stiffness of continuous composite beams with stiffened web are investigated.

    youdao

  • 方法应用于钢-混凝土组合梁工程优化设计

    The method can be used in the engineering optimization design of steel-concrete composite beams.

    youdao

  • 部分剪力连接组合梁受弯极限承载力变形影响

    Shear connection degree has an effect on the flexural capacity and deflection of composite beams.

    youdao

  • 简支混凝土组合梁承载力组合梁重要性能之一。

    The bearing capacity is one of the most important performances for the steel and concrete composite beams.

    youdao

  • 对于新型GFRP组合梁结构设计主要由刚度控制。

    The stiffness plays a key role in the design of GFRP bridge structure.

    youdao

  • 剪力连接非线性将导致钢与混凝土组合梁挠度显著增加

    Shear connection nonlinearity always results in a significant increase in deflection of steel-concrete composite beams.

    youdao

  • 国内外组合梁混凝土翼板有效宽度研究弹性分析较多。

    The study about effective width in and abroad are mostly based on theory of elasticity.

    youdao

  • 基础上,讨论影响组合梁混凝土裂缝宽度主要原因

    On this base, main reasons of influencing concrete slab's crack width of composite girder have been discussed.

    youdao

  • 本文还-混凝土组合梁截面延性及其影响因素进行讨论

    Discussion, in addition, is conducted on the ductility of cross section and the influence factors on it.

    youdao

  • 分析滑移入手,研究滑移效应对普通组合梁挠度应变影响

    Beginning with analyzing the slip, the slip effect impact the deflection and strain of steel-concrete beams are researched.

    youdao

  • 研究体外预应力钢-混凝土组合梁正常使用极限状态下受弯性能

    It is researched that the bending behaviors of external prestressed composite steel-concrete beams in service ability limit state.

    youdao

  • 研究了栓钉锈蚀钢—混凝土组合梁力学性能随栓钉锈蚀率的退化规律

    Study the variation rule of mechanical property of steel-concrete composite beam of the blot after its' corrosion.

    youdao

  • 最后,在作了一些假设以后,将这种相关关系引入混凝土组合梁设计中。

    At last it is applied to the design of steel and concrete composite beams under some hypotheses.

    youdao

  • 连续组合梁在内支座负弯矩区段会出现混凝土拉、钢梁受压不利局面

    Adverse condition of concrete in tension and steel joist in compression occurs at inner support regions of continuous composite steel concrete beams.

    youdao

  • 本文将“理论分析有限元分析”相结合来研究钢与混凝士组合梁工作性能

    In this paper, the work behaviors of steel-concrete composite beam are studied by the theory analysis and finite element analysis.

    youdao

  • 采用折算系数法,建立组合梁振动运动微分方程振动特性进行了分析。

    The differential equation of the vibration of combined beam is set up and its vibration characters are discussed in this paper.

    youdao

  • 组合梁计算理论,作者分别详细阐述了组合梁弹性分析塑性分析理论。

    In terms of the calculating theories of the composite steel-concrete beam, the elastic analysis and the plastic analysis are expounded systematically.

    youdao

  • 目前我国对钢—混凝土组合研究只局限采用普通材料的钢—混凝土组合梁桥。

    Currently, our country's research in composite steel-concrete beam bridge is limited in these composite beam bridge which use ordinary materials.

    youdao

  • 钢-混凝土组合梁钢梁混凝土通过剪力连接件连接形成整体共同工作构件。

    Steel-concrete composite beam is a kind of flexural member composed by concrete slab and steel beam via shear connectors.

    youdao

  • 连续组合中,剪力类型布置范围布置间距差别引起结构受力特性差异

    In the continuous composite beam bridge, the difference in type, arrangement area and arrangement space of shear connectors will cause variation in mechanical characteristics of the structure.

    youdao

  • 利用能量变分分析组合梁界面产生相对滑移后,组合梁翼缘板有效宽度变化规律。

    Based on energy-variational method, the interface slippage of composite beams and the variation of the effective width are analyzed.

    youdao

  • 另外,作者组合梁剪力连接件设计理论组合梁最大裂缝宽度计算方法了逐一地探讨。

    In addition, the calculating methods about the gap of the connectors and the maximum width of crack are discussed in the thesis.

    youdao

  • 通过试验结果理论、规范比较,考察不同荷载水平作用下半刚性连接组合梁性能影响

    The effect of semi-rigid connections on the performance of composite beams with various loadings was compared with predictions and codes.

    youdao

  • 根据提出位移模式,结合原理推导组合梁剪力滞效应微分方程以及相应边界条件

    A set of difFerential equations and the corresponding boundary conditions are derived according to virtual work principle and the longitudinal displacement patterns.

    youdao

  • 根据提出位移模式,结合原理推导组合梁剪力滞效应微分方程以及相应边界条件

    A set of difFerential equations and the corresponding boundary conditions are derived according to virtual work principle and the longitudinal displacement patterns.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定