• 将改进GB方法DCP方法应用于一纯延迟对象对象。

    Then refined GB approach and DCP approach are used to control first-order plus delay plant and high order plant as well.

    youdao

  • 典型工业过程传递函数通常采用惯性环节加延迟作为其数学模型。

    The open-loop transfer function of an industrial process is often described as a first-order process with time delay.

    youdao

  • 研究带有延迟欠阻尼对象最PID控制器的参数整定性能鲁棒性评价问题。

    This paper studies optimal tuning of PID controllers and its robust performance evaluation for under-damped plants with time delay.

    youdao

  • 对于具有延迟惯性开关控制非线性飞行器姿态系统,本文提出了采用解耦结构控制的方法

    For nonlinear attitude system of flying vehicle with pure time-delay, inertia and bang-bang control a control method using decoupling variable structure is given.

    youdao

  • 由于延迟离散系统存在延时的模型,因而该系统进行自适应控制,扰动消除会产生一定的延迟误差

    There only exists delay inversion model in pure-delay discrete system which causes delay error when adaptive inverse control is used for canceling noise.

    youdao

  • 仿真结果表明周期距离参数化扩展卡尔曼滤波算法有效解决经典扩展卡尔曼滤波算法方位角目标跟踪可能出现滤波发散现象,能处理声音信号的传输时间延迟问题

    The simulation results indicate that the variable cycle RP-EKF algorithm can resolve the filtering instability of EKF for the bearing-only target tracking and the time-delay problem.

    youdao

  • 滞后系统控制过程比较常见难以控制,火电厂大多数具有延迟、大时滞过程热工对象

    Large delay systems in the control process are very common and difficult to control, such as the majority thermal objects in the coal-fired power plant are with a large time delay.

    youdao

  • 滞后系统控制过程比较常见难以控制,火电厂大多数具有延迟、大时滞过程热工对象

    Large delay systems in the control process are very common and difficult to control, such as the majority thermal objects in the coal-fired power plant are with a large time delay.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定