• 碾压混凝土重力坝一种新的型。

    RCC dam is a new kind of dam.

    youdao

  • 龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗

    The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.

    youdao

  • 光照水电站大坝目前国内在建最高碾压混凝土重力坝

    The dam in Guangzhao hydropower station is the highest roller compacted concrete gravity dam in China at present.

    youdao

  • 龙滩碾压混凝土重力坝设计施工提供了重要参考依据。

    It provides important reference for Longtan high RCC dam design and construction.

    youdao

  • 对比分析了寒潮坝体应力影响,碾压混凝土重力坝设计施工中的温控提供了参考依据。

    The reliable basis for the dam design and for taking corresponding temperature control measures during the dam construction is provided.

    youdao

  • 工程推荐碾压混凝土重力坝方案通过地质勘察资料细致分析、评价,从而合理选择坝基建基

    This project recommend concrete gravity dam plan, by means of analysis geology data, we could select dam foundation plane reasonablely.

    youdao

  • 研究碾压混凝土重力坝失稳破坏机理基础上,提出准弹性准则作为碾压混凝土重力坝设计准则。

    Based on the study of the failure mechanism of RCC gravity DAMS, the hypoelastic criteria are proposed as the design criteria of RCC gravity DAMS.

    youdao

  • 枢纽工程中的拦河坝选定全断面碾压混凝土重力坝碾压混凝土合料选择工程的筑坝关键问题

    The selection of the admixture for its roller compacted concrete is the key to the construction of this project.

    youdao

  • 研究工作针对龙滩碾压混凝土重力坝设计需要成果即将开工的龙滩工程建设提供重要参考依据

    Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.

    youdao

  • 砂砾石坝(CSG)介于混凝土面板堆石坝(CFRD)碾压混凝土重力坝(RCC)之间一种

    Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).

    youdao

  • 应用混凝土渗流温度耦合分析的数字模型,进行了龙滩碾压混凝土重力坝稳定渗流场与稳定温度场的耦合分析。

    Coupled seepage and temperature fields in Longtan roller compacted concrete gravity dam are analyzed by applying the mathematical model for coupled seepage and temperature fields in concrete dam.

    youdao

  • 在对龙滩碾压混凝土重力坝渗流特性进行分析时,就有关主要渗流影响因素进行众多计算工况比较分析研究得出大坝的最终优选方案

    The author researches the seepage characteristics of Longtan RCC dam by finite element method (FEM), and concludes the best suitable seepage control scheme of the dam after analysis in so many cases.

    youdao

  • 此外本文结合碾压混凝土重力坝工程,依据现场采集坝体温度资料,对碾压混凝土热学参数进行反演利用反演结果进行温度反馈计算

    In addition, according to measured temperature data of a RCC gravity dam, the thermal parameters inversion is done, whose result is used to calculate the temperature field again.

    youdao

  • 贵州花水水电站碾压混凝土双曲拱坝、重力坝开挖采用梯段爆破

    The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.

    youdao

  • 贵州花水水电站碾压混凝土双曲拱坝、重力坝开挖采用梯段爆破

    The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.