碾压混凝土重力坝是一种新的坝型。
龙滩碾压混凝土重力坝采用钢筋混凝土面板作为防渗体。
The reinforced concrete face-slab is adopted as impervious body by Long Tan RCC Dam.
光照水电站大坝为目前国内在建的最高的碾压混凝土重力坝。
The dam in Guangzhao hydropower station is the highest roller compacted concrete gravity dam in China at present.
为龙滩高碾压混凝土重力坝设计和施工提供了重要的参考依据。
It provides important reference for Longtan high RCC dam design and construction.
对比分析了寒潮对坝体应力的影响,为碾压混凝土重力坝的设计和施工中的温控提供了参考依据。
The reliable basis for the dam design and for taking corresponding temperature control measures during the dam construction is provided.
工程拟推荐碾压混凝土重力坝方案,通过对地质勘察资料细致分析、评价,从而合理选择坝基建基面。
This project recommend concrete gravity dam plan, by means of analysis geology data, we could select dam foundation plane reasonablely.
在研究碾压混凝土重力坝失稳破坏机理的基础上,提出以准弹性准则作为碾压混凝土重力坝的设计准则。
Based on the study of the failure mechanism of RCC gravity DAMS, the hypoelastic criteria are proposed as the design criteria of RCC gravity DAMS.
枢纽工程中的拦河坝选定全断面碾压混凝土重力坝,其碾压混凝土掺合料的选择是本工程的筑坝关键问题。
The selection of the admixture for its roller compacted concrete is the key to the construction of this project.
研究工作针对龙滩高碾压混凝土重力坝设计的需要,其成果为即将开工的龙滩工程建设提供了重要的参考依据。
Aimed at the design demand of high RCC gravity dam for Longtan project that is about to start, the results of studies will provide the important reference basis.
胶凝砂砾石坝(CSG)是介于混凝土面板堆石坝(CFRD)和碾压混凝土重力坝(RCC)之间的一种新坝型。
Cement sand and gravel (CSG) dam is a new type of dam between concrete-faced rock-fill dam (CFRD) and roller compacted concrete dam (RCC).
应用混凝土坝渗流场与温度场耦合分析的数字模型,进行了龙滩碾压混凝土重力坝稳定渗流场与稳定温度场的耦合分析。
Coupled seepage and temperature fields in Longtan roller compacted concrete gravity dam are analyzed by applying the mathematical model for coupled seepage and temperature fields in concrete dam.
在对龙滩高碾压混凝土重力坝渗流特性进行分析时,就有关主要渗流影响因素进行众多计算工况的比较分析研究,得出大坝的最终优选渗控方案。
The author researches the seepage characteristics of Longtan RCC dam by finite element method (FEM), and concludes the best suitable seepage control scheme of the dam after analysis in so many cases.
此外,本文结合某碾压混凝土重力坝工程,依据现场采集的坝体温度资料,对碾压混凝土热学参数进行反演,利用反演结果进行温度场反馈计算。
In addition, according to measured temperature data of a RCC gravity dam, the thermal parameters inversion is done, whose result is used to calculate the temperature field again.
贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。
The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.
贵州大花水水电站碾压混凝土双曲拱坝、重力坝开挖采用深孔梯段微差爆破。
The excavation of the rolled concrete double-curvature arch dam and gravity dam in Dahuashui hydroelectric station in Guizhou adopted deep-hole graded slight differences demolition.