中涂层养护硬化时间约为8小时以上;
The curing time of the mid-coat should be more than 8 hours.
该产品具有良好的高温流动性,较短的硬化时间,较高的烧结强度优质的耐侵蚀性能。
It has a good high tenperature flow ability short setting time, rignersintered strcngth and high corrosion resistance.
混凝土﹑水泥砂浆﹑环氧树脂砂浆的凝结硬化时间长短对测试结果有比较显著的影响。
However, the setting and hardening time of the concrete, the mortar influences the test results obviously.
结论声学造影后肝实质时间强度曲线可以反映肝硬化时大鼠肝脏微循环与血流动力学改变,有望成为诊断肝硬化的新方法。
Conclusion tic of liver parenchyma after contrast ultrasound can reflect the changes of hepatic microcirculation and hemodynamics in liver cirrhosis, which is hopeful to be a new diagnostic method.
同时讨论了粉煤灰水泥硬化浆体的物理化学性能与水化时间的关系,以及硬化浆体中粉煤灰的火山灰活性。
At the same time, the relationship between the physical-chemical properties of the harden paste and the hydration age, the pozzolan activity of the fly ash in the harden paste have been discussed.
应用于石英石板材的组装拼接,能达到较高的粘接强度及无缝拼接效果.CHMA660以10:1的比例与硬化剂使用时,其操作时间为8-13分钟,固化时间为20-25分钟,25分钟后即可打磨加工。
When CHMA660 is used with curing agent in 10:1, the operation time is 8-13 minutes and the solidification time is 20-25minutes. The polishing processing can be conducted after 25 minutes.
应用于石英石板材的组装拼接,能达到较高的粘接强度及无缝拼接效果.CHMA660以10:1的比例与硬化剂使用时,其操作时间为8-13分钟,固化时间为20-25分钟,25分钟后即可打磨加工。
When CHMA660 is used with curing agent in 10:1, the operation time is 8-13 minutes and the solidification time is 20-25minutes. The polishing processing can be conducted after 25 minutes.
应用推荐