周修庆:副经理。主持集团矿山开发全面工作。
Zhou Xiuqing: Assistant Manager. Group chaired mining comprehensive work.
矿山生产规模是矿山开发过程中一项非常重要的决策要素。
The production capacity of gold mines is an important factor influencing decision-making during the development of mines.
基本阐明了矿床的开采技术条件,为下一步矿山开发提供了参考。
Moreover, the paper discusses the exploitative conditions of the gold deposit, laying a foundation for further development oft…
通过对区域地表水和地下水的环境质量评价,分析了矿山开发对区域水环境的影响。
Through evaluating the quality of surface-water and groundwater, the influence of minerals exploitation on the regional water environment are analyzed.
矿山开采成本随矿山开发的深入,是逐年上升的,其行业收益率应大于同期国债收益率。
Increasing in mining cost, industry-wide earning ratio should be more than that of national debt in the corresponding period.
可用于道路修筑、水电工程、农田改造、港口建设矿山开发及其它建筑工程项目的土石方作业。
It is applicable for road construction, water and electricity engineering farmland leveling, port building, mining and other engineering conditions.
针对影响水环境变化的因素提出开展采煤保水研究、调整矿山开发规划、矿水污染治理的措施。
Aimed at factors to influence the aquatic environment, the paper put forward measures of water source protecting during coal mining, regulating coalmine exploitation plan and mine...
Australian矿业公司目前还没有打算在中国开始从事矿山开发工作,但是该公司相信,中国是推动矿产需求的一个火车头。
The Anglo-Australian mining company does not expect to materialize mining production in China in the near term, but believes the country will remain a robust driver to boost demand.
这个矿山有待开发。
一些中国投资者所收购的公司,其矿山还处在开发或勘探的较早阶段。这种收购风险更高,但也可能更加赚钱。
Some Chinese investors are buying companies with mines that are at earlier stages of development or exploration, a riskier but potentially more profitable proposition.
论述了矿山开采专家系统的结构、系统开发与设计、知识获取等问题。
This paper discussed the structure, development, design, knowledge getting etc. of the expert system of mining.
本文介绍了矿山监测系统的整个开发过程。
The paper introduces the whole develop process of mine monitoring system.
利用所开发的生产矿山地质管理信息系统进行地质找矿预测。
To forecast mine using the geology management information system of production mining which have been developed.
另外在采选等方面就如何有效地合理利用与开发矿产资源,积极采用了矿山生产的新方法新技术。
Meanwhile, the company has actively adopted new methods and new technology in the mine production so as to effectively and rationally utilize and exploit the mineral resource.
探讨了煤炭开发对矿山环境的破坏与治理问题。
This paper discusses the destruction of coal development to mine environment and its treatment countermeasure.
为此将人工智能科学与矿山CAD技术集成,开发出露天矿生产计划智能决策计算机系统,取得较好效果。
An intelligent decision software for mining plan has been developed by combining mining CAD technique with intelligent method and achieved good results.
高海拔矿山由于大气条件的变化,对矿床开发建设产生了许多特殊问题需要解决。
In higher sea-level mines, due to the variable conditions of atmosphere, there are many especial problems in exploitation and construction of deposit, which remain to be solved reasonably.
矿山地质学是研究矿床开发过程中的地质及其相关的矿产资源经济问题的理论与方法。
Mining geology is a theory and a method to study the geology of mineral deposits in the process of their development and the problems related to the economics of mineral resources.
金属矿山地下开采扩建合理生产规模的确定,是矿区开发过程中的一个重要决策因素。
The production scale of the underground metal mine is one of the decisive factors to be considered when the mine is enlarged.
本文讨论的就是与长沙矿山研究院自动化仪表厂合作开发的智能涡街流量计系统。
What our paper argues is intelligent vortex street flowmeter system developed by us, along with Automation Meter Factory Of Changsha Mining Research Institute.
结合采矿技术和计算机3d技术,开发了金属矿山开采的MCAI系统,取得良好的效果。
Combining mining and the computer 3d technology, we have developed the MCAI system for mining and gotten good result.
他们正在开发一座矿山。
针对AMD的形成机理,应积极研究开发先进的生物处理技术,对该矿山的AMD进行综合治理。
Based on the mechanisms of AMD formation, advanced and economical microbiological remediation technologies should be developed for synthetic remediation of the AMD.
枣庄市是一座资源型城市,矿产资源的开发利用产生了一系列矿山环境地质问题。
Zaozhuang is a resources-exploited city. Developing and using mineral resources brings a series of mine-environmental-geologic issues.
本文简介了某铜矿山尾砂可浸性参数初步探索,为尾砂开发、回收铜金属提供了一条新的途径。
Prelimary study is made of the leaching parameters of a copper mine tailing, and a new method for tailing leaching and copper recovery in the future is proposed.
本文旨在利用所开发的计算机模型,对矿山设计的这些方面进行检验。
The paper aims to examine these aspects of mine design using the computer models developed.
运用该方法开发了“矿山储煤场三维动态管理信息系统”,说明了其可行性与实用性。
The three-dimensional dynamic information management system of the coal storage in the coalmine developed with this method indicates that the method is feasible and practical.
本文采用TURBO—PROLOG语言开发了一个小型专家系统用于露天矿山的设备选型。
TURBO-PROLOG language is used for developing a small expert system for equipment selection in open Cut mines.
本文采用TURBO—PROLOG语言开发了一个小型专家系统用于露天矿山的设备选型。
TURBO-PROLOG language is used for developing a small expert system for equipment selection in open Cut mines.
应用推荐