验收时间:验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
验收考核在机组热负荷试车结束后2个月的试生产时间内进行。
The performance test shall be finished within the trial production period of 2 months after completion of hot commissioning of production line.
采用该监测系统可实时监测高炉冷却系统的水温差、流量及热负荷,为高炉安全生产提供有力保障。
The system can monitor water temperature difference, flux and heat load of the BF. The operation result has shown that the system establish basis to blast furnace silent running.
国内对火花点火式沼气发动机的研究甚少,生产的沼气发动机在运行中出现热负荷高、可靠性与经济性差的问题。
Research on ignited biogas engines is insufficient in our country, which leads to serious problems of biogas engines such as high heat load, bad reliability and low efficiency.
国内对火花点火式沼气发动机的研究甚少,生产的沼气发动机在运行中出现热负荷高、可靠性与经济性差的问题。
Research on ignited biogas engines is insufficient in our country, which leads to serious problems of biogas engines such as high heat load, bad reliability and low efficiency.