• 同时,考虑到隧道选线经济合理性,提出爆破施工荷载作用下隧道顶板厚度设计参考值进行验证,类似工程具有一定的指导意义

    Then, the design rock cover is steady under such explosive load. At the same time, the referenced rock cover is offered in view of the economical factors, and the value is testified finally.

    youdao

  • 同时,考虑到隧道选线经济合理性,提出爆破施工荷载作用下隧道顶板厚度设计参考值进行验证,类似工程具有一定的指导意义

    Then, the design rock cover is steady under such explosive load. At the same time, the referenced rock cover is offered in view of the economical factors, and the value is testified finally.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定