• 某电厂煤仓出现变形裂缝振动问题。

    Deformation, cracking and vibration phenomenon have appeared in raw coal silo of a thermal power plant.

    youdao

  • 井口煤仓有效容积影响因素很多计算复杂

    There are many factors influenced to the effective volume of the coal feeding bunker. The calculation is complicated.

    youdao

  • 结合潘二矿煤仓工程实例详细介绍了筒仓滑模施工技术

    Combining engineering example with coal storage bunker, introduced slide form construction technology in detail.

    youdao

  • 分析锅炉煤仓原因煤仓塞煤锅炉运行不利影响

    The cause of coal plugging and its influence on boiler running are analyzed.

    youdao

  • 介绍了特大型采区煤仓施工技术指出了施工过程注意几个问题

    This paper introduces the construction techniques for the coal bunker in supergiant mining area, and points out some problems needing attention in the construction.

    youdao

  • 基于一种辅助光源照射方法提出井下煤仓位进行检测基本方法。

    Based on a method of a assistance photosource, a basic method of coal level detection on the mine shaft coal bin is put foruard.

    youdao

  • 介绍煤仓段预注浆加固方法分析了冒落原因及注浆效果

    Introduce the grouting reinforcement method of the soft rock of coal bin and fall area and analyze the fall reasons and the grouting result.

    youdao

  • 结合煤仓上中下不同地段特点研究不同破坏技术施工方法

    In combination with the top, meddle and bottom section features of the main coal silo, the paper studied the different anti failure technology and construction method.

    youdao

  • 本文提出一种结构简单水平机械煤仓给出有关参数的计算方法

    In the paper, the part-presser horizontal mechanical coal bin and analysis method of its vertical presser are introduced.

    youdao

  • 模型一定条件能够预测出煤仓里卸下灰分而且便于计算机实现

    Under a certain condition the model can be used to predict ash of coal delivered from bin. This is also beneficial to effecting computer management.

    youdao

  • 告成煤矿卸载煤仓建成以来,仓壁内出现涌,造成仓内煤体粘结而难以放出。

    Since the unload station coal bunker is built in Gaocheng coal Mine, water is obvious in the coal bunker, it is difficult to cave coal which is glued in the coal bunker.

    youdao

  • 阐述杜儿坪矿动力煤仓改造必要性给出了改造动力煤仓卸载站的技术方案施工方案。

    This paper expounds the necessity of steam coal bunker reformation in Duerping Mine, and gives the technical scheme and construction scheme of reformation of unloading chamber in steam coal bunker.

    youdao

  • 过程平壁煤仓截面形状分别矩形、圆形的落煤管起拱影响因素进行理论研究。

    The influencing factors of coal arch camber in planomural coal bin and coal drop pipe with rectangular or circular cross section during coal drop are studied theoretically.

    youdao

  • 采用一种利用辅助光源井下煤仓进行检测基本方法,研究了煤仓煤位图像采集方法。

    By applying a basic method for underground coal bunker coal level testing assisted by auxiliary lighting system, this article discusses bunker coal level image collecting method.

    youdao

  • 针对目前煤仓堵塞处理困难危险性大的特点,对堵塞原因进行了分析,并提出一种新的处理方法

    It is difficult to deal with the coal bucker blocked up and dangerous. Through analyzing the reason, a new dealing method is found.

    youdao

  • 介绍了在破碎岩体中施工立眼煤仓,采用带、锚索钢筋混凝土联合支护应用,立眼煤仓施工中使用帮锚索,在益新煤矿还是首例。

    This article introduces the application of how to construct the coal depot, and combined support with anchor mesh shotcrete, steel strape, anchor rope, steel and concrete.

    youdao

  • 由于完全控制了仓中的匀速运动,开创蛇形溜槽国内煤仓中的首创应用块煤损失降低了4.01%,达到国内同行业先进水平

    The snake-chute is applied for the first time in China and it makes the lump coal loss reduce 4.01%, which gets to the national advanced level within the same trade.

    youdao

  • 由于完全控制了仓中的匀速运动,开创蛇形溜槽国内煤仓中的首创应用块煤损失降低了4.01%,达到国内同行业先进水平

    The snake-chute is applied for the first time in China and it makes the lump coal loss reduce 4.01%, which gets to the national advanced level within the same trade.

    youdao