介绍半潜驳出运沉箱工艺在烟台港、岚山港、厦门港的应用情况。
The technology of caisson transportation by semi-submerged barge in Yantai port, Lanshan port and Xiamen port are introduced.
为了提高经济效益,烟台港对轨道衡实施改造,实现了无人值守。
In order to raise economic efficiency, Yantai Port carries out reform on the track scale and realize unmanned operation.
第四、港口岸线资源整合:烟台港与龙口港重组,组建烟台港务集团有限公司。
The Yantai port and the dragon buccal groove reorganization, sets up Yantai Harbor affairs Group Limited company.
烟台港作为我国水路运输的主枢纽港之一,自1861年开埠以来,一直在全国综合运输网中居于重要地位。
Yantai port, as a main national harbor and basic port of China, has been playing an extremely important role in the nationally synthesize transportation system since established in 1861.
本文简要介绍了烟台港三期工程集装箱码头装卸桥后轨道梁基础处理方案的比选、优化,施工要点与实施效果。
This paper briefly introduces the proposal and construction of foundation treatment for rare-beam of container crane at Container Terminal, Yantai Port (Phase Three Project).
介绍了烟台港建立的针对性维修体制,并就其理论基础、体制模式、主要内容和实施情况及效果分别作了叙述。
This paper describes the conditional maintenance system (CMS) in Yantai harbour as well as its theoretical fundamentals, mode, main contents, performance conditions and results.
公司位于美丽的海滨城市烟台莱山区胜泉工业园内,北临烟台港,南临烟台机场,风景秀丽,气候宜人,交通便利。
Company is located in the beautiful coastal city of Yantai Laishan Quan-Sheng Industrial Park, Yantai north, south Yantai Airport, beautiful scenery and pleasant climate and convenient transportation.
6月13日当地时间1600时,当我船要在烟台港指定泊位系泊时,一艘名为“大宇”的船与我船相撞,其锚伸入我船艏尖舱。
At 1600 hours LT June 13, when my vessel was to moor in the arranged berth in Yantai Port, a ship named Dayu collided with us and her anchor pierced our peak tank.
6月13日当地时间1600时,当我船要在烟台港指定泊位系泊时,一艘名为“大宇”的船与我船相撞,其锚伸入我船艏尖舱。
At 1600 hours LT June 13, when my vessel was to moor in the arranged berth in Yantai Port, a ship named Dayu collided with us and her anchor pierced our peak tank.
应用推荐