• 高速铁路区间渡线设置诸多因素的影响。

    Setting section crossover in high-speed railway is subject to many factors.

    youdao

  • 提出正常间距单渡线实施过程需要采取具体措施包括夹直线及其绝缘接头的处理问题

    The problem is, as the author argues, how to take the detailed measures in engineering process, including the technique to deal with the short rail and the insulated

    youdao

  • 北京地铁4线白石桥至学院南路区间线隧道作为工程背景阐述复杂环境下浅埋大跨隧道施工的地层沉降控制方法

    Taking the crossover tunnel in the Baishiqiao-Xueyuannanlu metro section tunnel of Beijing metro No 4 as the engineering background, the control method for ground subsidence is introduced.

    youdao

  • 应用数值模拟方法研究了在构法修建隧道基础上拆除管片修建渡线隧道中双联方案可行性,研究表明双联拱方案可行的;

    The construction plan of double-joined arch is validated using numerical simulation when dilapidating segments to construct single connecting tunnel between two shield-driven tunnels in this paper.

    youdao

  • 主要介绍了特征线溪洛泄洪洞流鼻设计中的应用情况。

    Application and research of method of characteristics in design of flip bucket for spillway tunnel at Xiluodu Hydropower Project is mainly presented.

    youdao

  • 针对线斜交斜交角度较大的情况下,目前尚缺少理论经验计算方法的特点,某多线大角度斜交桥进行了水工模型试验。

    Because multiline big Angle skew bridge is lack of theory and experience calculation method at present, it needs to be experimented by hydraulic model.

    youdao

  • 采用平面二维水流泥沙数学模型进行线线影响计算,模型考虑悬移质推移质泥沙运动、桥及料场的阻力变化

    The2-D flow and sediment mathematical model is used to compute the effect of the engineering of riverside embankment change.

    youdao

  • 采用平面二维水流泥沙数学模型进行线线影响计算,模型考虑悬移质推移质泥沙运动、桥及料场的阻力变化

    The2-D flow and sediment mathematical model is used to compute the effect of the engineering of riverside embankment change.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定