• 海洋使用浮动作业节流压井管线是从海底喷器组直接排出的,之后通过外部导管到达海平面

    In floating offshore operations, the choke and kill lines exit the subsea BOP stack and run along the outside of the riser to the surface.

    youdao

  • 今天上午9时,中美海缆工程石老人海水浴场动工,在海底铺设光缆施工一直海上进行施工作业,把光缆中国铺设美国

    Today 9, CuCN works in Shek elderly Beaches start laying submarine cable in the construction of ships, will have been at sea construction work, the laying of the cable from China to the United States.

    youdao

  • 浮动海洋钻井作业位于水面伸缩节,它允许钻井升降(垂直运动)保持导管接触海底

    A telescoping joint at the surface in floating offshore operations that permits vessel heave (vertical motion) while maintaining a riser pipe to the seafloor.

    youdao

  • 浮动海洋钻井作业位于水面伸缩节,它允许钻井升降(垂直运动)保持导管接触海底

    A telescoping joint at the surface in floating offshore operations that permits vessel heave (vertical motion) while maintaining a riser pipe to the seafloor.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定