测试架石英管,以及石英外管,石英活塞顶杆。
The 10 test frame quartz tube, quartz tube, quartz rod, piston top.
一种利用纸箱抗压仪测试胶水黏结性能的专用测试工具测试架(100)和测试件(200) ;
The invention relates to a testing stand (100) of a special testing tool and a testing piece (200) used for testing the stickiness of glue by using a carton compression apparatus.
金属测试架,配有可调支脚,织物安装夹及铝制灰烬盘。可将套具放置在可选配的天平上并数字读数。
Metal test frame, equipped with adjustable supporting feet, fabric installation clip and aluminum ashes plate. But will set a placed in optional on the balance of and digital readouts.
制造商们正在测试一个系统,它可以追踪离架的货品并提醒雇员补充上货。
Manufacturers are testing a system that tracks products leaving the shelves and alerts employees to restock.
第二架第二架空客军事运输机a 400m(即msn2)在飞行测试后一系列的试验中,启动了自身全部EPI TP400涡轮发动机。
The second Airbus Military A400M, known as MSN2, has run all four of its Europrop International (EPI) TP400 turboprop engines in a series of trials after being handed over for flight test.
美国国家航空航天总署用一架改良型喷气战斗机进行了测试,结果表明特殊的机身形状可以减弱音爆。
Tests by NASA with a modified fighter jet have shown that novel airframe shapes can reduce the boom.
可是在1994年6月,一架空客自己拥有的A330客机在一次模拟起飞过程出现引擎故障的测试飞行中失事,在离开图卢兹后不久坠落,机上七人全部罹难。
However, in June 1994, an A330 owned by Airbus on a test flight simulating an engine failure on takeoff crashed shortly after leaving Toulouse, killing all seven people on board.
VH- 71计划包括多个测试飞机,5架Increment1配置较低装备的业务直升机和23架Increment2直升机,将是其充分的选择范围。
The VH-71 program includes several test aircraft, five Increment 1 lesser-equipped but operational helicopters, and 23 Increment 2 helos that would have had the full range of options.
最近,一架名为欧洲X立方的直升机在法国的一次飞行测试中飞行时速达到了430公里每小时。
In a recent test flight in France the experimental Eurocopter x3 (pronounced "x cubed" and pictured above) managed 430kph.
他可以让你尽快使用脚手架创建应用,甚至加入一些测试。
He gets you as far as finishing off some scaffolding and even adding some tests.
在一张未标明日期的图片中,一架实物模型的A - 12间谍飞机倒挂着停放在51区的一个测试塔上,这是为了测试该飞机的外观在雷达上可视或不可视的程度。
In an undated picture, a mock-up of the A-12 spy plane sits perched upside down on a testing pylon at Area 51-part of radar tests to reveal revealed how visible, or invisible, the design was to radar.
波音表示,地面振动测试已经于上周在第二架测试飞机-ZA002上完成。
Boeing also confirms that ground vibration testing were concluded last week on the second test aircraft, ZA002.
该团队也在设计第二架机翼机身混合飞机,即X - 48c,为未来的飞行测试做准备。
The team is also preparing a second hybrid wing body aircraft, the X-48C for future flight tests.
两架踏浪者都在太平洋上空进行了短距测试,其中一架失败。
Of the two WaveRiders tested, both for short distances over the Pacific, one failed.
尽管几家欧洲航空公司成功进行了穿越火山灰区域的测试飞行,但是因发动机吸入火山灰,芬兰一架喷气式战机损失惨重。
And though several European airlines conducted successful test flights in the danger zone, the engines of a Finnish military jet suffered considerable damage as a result of breathing in the ash.
设想一下降低产生缺陷和中断系统各种行为方面的风险所需的测试脚手架。
Just imagine the test scaffolding that would be required to mitigate the risks of introducing defects and breaking various behavioral aspects of the system.
海上测试计划2012年使用一艘法国海军护卫舰和一架波音H-6U“小鸟”旋翼无人机进行。
Sea trials of the demonstrator are planned for 2012 using a French Navy frigate and a Boeing, H-6U Unmanned Little Bird rotorcraft.
如果787测试顺利,明年下部年耐心的启始客户-全日空航空公司将收到于2004年4月定购的首批50架飞机。
If the 787's testing goes well, late next year All Nippon Airways, the patient launch customer, should receive the first of the 50 planes it ordered in April 2004.
而正在进行的这一系列测试飞行,其实是为了给用来实现环球飞行的第二架飞机……HB-SIB确定最终设计方案。
The series of test flights which it is undertaking are being used to set the final design for a second aircraft, HB-SIB, which will be used to make the global flight.
首批两架直升机将用于研发目的,并在未来五年用于培植测试机组配套设备。
The first two aircraft will be used for developmental purposes, and the next five after that will be used to train the first unit equipped, he said.
一旦BF-1完成所有测试,美国国防部计划发放资金为美国海军陆战队购买六架F-35B飞机。
Once the BF-1 has completed its inaugural flight, the US Department of Defense is expected to release funding for the purchase of six F-35B aircraft for the US Marine Corps.
本文介绍了性能测试及调试新rational ClearQuestWeb 7.1架构的系统性方法。
This article introduces a systematic approach to performance testing and tuning the new ClearQuest Web 7.1 architecture.
这架采用全集成数据链(FIDL)的B-1轰炸机于10月16日结束第一阶段测试,其中包括在美国空军爱德华兹空军基地进行了9架次飞行。
The B-1 Fully Integrated Data Link (FIDL) flight test plan for Phase 1 concluded Oct. 16; it included nine sorties performed by the U.S. Air Force at Edwards Air Force Base.
1月飞行测试的关键是减少KQ - X项目风险,为2012年春天进行的两架全球鹰无人机自主空中加油做好准备。
The January flight was key to reducing risks as the program prepares for autonomous aerial refueling of two Global Hawks in the spring of 2012.
为一劳永逸终结关于Ho 2 -29是否具备隐形能力的争议,专家们第一次检验了那架幸存2 - 29。并以当时二战雷达技术为基础用一架便携式雷达对它作了测试。
To determine once and for all whether the Ho 2-29 had stealth capabilities, experts first examined the surviving 2-29 and probed it with a portable radar unit based on World War II radar tech.
一架楔尾飞机将由波音公司澳大利亚防务部门的人员在南澳大利亚的Woomera测试厂控制扫描鹰的行动。
A Wedgetail will take control of ScanEagles operated by Boeing Defence Australia personnel at Woomera Test Facility in South Australia.
迄今为止,预计800多架的国际销售订单中只有5架飞机由合作国家签订了合同——分别是荷兰的3架以及英国的2架用于操作测试。
To date, only five aircraft of the anticipated 800-plus international sales have been contracted by partner countries - three operational test aircraft for the UK and two for the Netherlands.
1972年北京航空学院(BIA)使用从坠毁“火蜂”回收的部件组装了两架原型用于飞行测试并成功飞行。
Beijing Institute of Aeronautics (BIA) used parts recovered from the Firebee wreckages to assemble two prototypes for flight tests in 1972 and these flew successfully.
1972年北京航空学院(BIA)使用从坠毁“火蜂”回收的部件组装了两架原型用于飞行测试并成功飞行。
Beijing Institute of Aeronautics (BIA) used parts recovered from the Firebee wreckages to assemble two prototypes for flight tests in 1972 and these flew successfully.
应用推荐