介绍歌乐山隧道施工过程中出现的涌水、涌泥情况,帷幕注浆堵水的施工方法及相应措施。
Curtain grouting method and corresponding measures are introduced to deal with gushing water and gushing mud during construction of Geleshan Tunnel.
在我国岩溶区许多的铁路、公路隧道及水工隧道的修建中,遇到大量的岩溶涌水、突泥问题,给工程施工和运营带来很大危害。
The problems of karst water and mud bursting in tunnels have occurred in many tunnels, highway and railway constructions and operations, which endanger many projects.
在岩溶地区隧道施工过程中,涌水、涌泥(砂)已经成为隧道施工的第一大害。
During the construction of tunnels in karst mountain, water inrush and gushing mud (sand) disaster has ranked the first in all the disasters.
由于地质条件的复杂性,隧道工程在开挖过程中面临着断层、溶洞、涌水、涌泥等各种地质灾害。
As the complexity of the geological conditions, various geological disasters such as fault, rock burst, karst caves and so on in the tunnel excavating will be faced.
由于地质条件的复杂性,隧道工程在开挖过程中面临着断层、溶洞、涌水、涌泥等各种地质灾害。
As the complexity of the geological conditions, various geological disasters such as fault, rock burst, karst caves and so on in the tunnel excavating will be faced.
应用推荐