• 基于大量油气开发的实际资料,建立了预测油气产量累积产量可采储量简单模型

    Based on statistical development data of large oil and gas fields, a simple model for predicting production, cumulative production, and recoverable reserves is developed.

    youdao

  • 瑞利模型用于预测油气产量累积产量、储量最高年产量及其相应的开发时间累积产量。

    Rayleigh model can be used to forecast production, cumulative production, recoverable reserves, maximum annual production and its corresponding time and cumulative production of oil and gas fields.

    youdao

  • 基于威布尔预测模型扩展推导提出了预测油气可采储量比的方法

    Based on the results from an extended derivation of Weibull Model, the methods to predict remaining reserves and reserve-production ratio of oil and gas fields are proposed in this paper.

    youdao

  • 方程用来预测油气整个开发阶段指标比较准确测算油气田的储量

    This equation can either predict index during the whole developing stage of oil and gas field, or predict relatively accurately the recoverable reserve.

    youdao

  • 方法成功应用西南油气分公司2002年、2003年、2004年度天然气新增动用可采储量标定申报工作中。

    The method has been successfully used for the calibration and declaration of the yearly new adding recoverable reserves of 2002, 2003 and 2004 for PCL Southwest Branch.

    youdao

  • 目前中国油气资源勘探开发面临后备可采储量不足勘探程度区域受到重视。

    At present, the areas of low degree of prospecting are paid much attention to for insufficient recoverable backup reserves during exploration and development of oil-gas resources.

    youdao

  • 油气勘探支出中的钻井勘探支出,确定该井发现探明经济可采储量的,将钻探该井的支出结转为井相关设施成本。

    Drilling exploration costs included in the oil and gas exploration costs are capitalised as Wells and related facilities when the Wells are completed and economically proved reserves are found.

    youdao

  • 基于油气工程中的产量递减提出预测油气储量剩余可采储量方法

    Based on the production decline method in petroleum reservoir engineering, a new method to predict recoverable and remaining recoverable reserves of oil and gas fields has been proposed in this paper.

    youdao

  • 用于预测油气递减阶段产量累积产量可采储量

    It can be used for prediction of production, cumulative production and recoverable reserves in depletion stage.

    youdao

  • 油气开发过程中,储量编制油气田开发方案进行综合调整效果评价重要依据

    In the process of oilfield development, controlled recoverable reserve is important basis of compiling oilfield development program, comprehensive adjustment and effect evaluation.

    youdao

  • 油气开发过程中,储量编制油气田开发方案进行综合调整效果评价重要依据

    In the process of oilfield development, controlled recoverable reserve is important basis of compiling oilfield development program, comprehensive adjustment and effect evaluation.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定