在清单2c中,第1行显示所选步骤的说明和步骤名称。
In Listing 2c, the selected step description and step name are displayed in Line 1.
Header Header小部件显示与工作项相关的系统属性,包括步骤名称、最终期限、主题和说明。
Header Header widgets display system properties associated with work items, including step name, deadline, subject, and instructions.
否则,生成脚本并使用步骤1中创建的名称将其保存在磁盘中。
Otherwise, generate the script and save it to disk using the name from Step 1.
在稍后的步骤中,我们会将目的地名称指定为激活规范配置的一部分。
We will specify the destination name as part of the activation specification configuration in a later step.
如果在上面的步骤中手动添加节点,您可以单击节点的名称。
If you added the node manually in the steps above, you can click the name of the node.
注意,选项是步骤的函数签名的一部分,它们的名称都是不变的。
Note that options are part of the functional signature of a step, and their names are invariant.
在步骤3中,配置参数为:操作的名称、端口号、目标服务端点的地址、返回类型。
In step 3, configuration parameters are: name of the operation, port type, address of the target service endpoint, return type.
对于每种情况,我需要的只是被测试的组件的逻辑名称以及一系列步骤,以便创建场景。
All I needed for each case was a logical name for the component under test and a series of steps to create the scenario.
名称元素指定这些步骤扩展的基本命令。
The name element specifies the base command that these steps extend.
对于步骤1,为集群分配一个名称。
为了降低通信成本,在步骤4和5中检索pMI数据时P MI并不返回静态配置信息(如数据名称和描述)。
To reduce the communication cost, PMI does not return static configuration information (such as data name and description) when PMI data is retrieved in Steps 4 and 5.
此步骤是将正确的焦点/非焦点数据与相应的窗口名称关联在一起的关键。
This step is key to associating the correct focus/nonfocused data with the appropriate window name.
没有未标识的用例,而且在此工作结束时,业务流程组合中的每个步骤都有指定的用例名称和执行的主要步骤。
No use case is left unidentified and at the end of this work effort and every single step in the business process portfolio has an assigned use case name and major steps of execution.
遵循这些步骤,并确保在下面的步骤中正确使用配置好的数据库名称及其别名。
Follow the steps, and ensure that you use the the configured database names and their aliases correctly in the steps below.
这会让您完全控制您创建的资源名称,但是也强制您执行多个配置步骤。
This gives you full control over the names of the resources you are creating, but also forces you to perform several configuration steps.
每当在知识库结构中进行任何修改时,比如添加目录或修改名称,都需要重复这个导出步骤。
This export step needs to be repeated each time you change anything in the KB structure, like when you have add a category, or change a name.
如果这些步骤都正确工作,您就会看到确实存在IBMDB 2ODBCdriver类型的数据源名称db1。
If the steps did work correctly you will see confirmation of the DB1 Data source name existing of type IBM DB2 ODBC DRIVER.
正是公投中要更改名称的明显意图使我们认为这项计划是一个要改变现状的步骤。
It is the apparent pursuit of name change in the referendum, therefore, that makes the initiative appear to us to be a step intended to change the status quo.
注意,此步骤与导出部分中的配置步骤相同,不过数据库名称是ABCINS,而不是ABCFIN。
Note that this step is the same as the configuration step in the export section, except that the database name is ABCINS rather than ABCFIN.
由于依赖于您在完成文章1时如何命名自己的连接(或者以上的步骤3中),所以您的连接的名称可能不同。
Depending on how you named you connections when completing article 1 (or in step 3 above) your connection name may be different. Figure 2 illustrates how the dialog should look when complete.
我们编辑了在上一步骤中得到的ME . ddl文件,并更改了模式名称,以便匹配所需的值。
We edited the ME.ddl file obtained in the previous step and changed the schema name to match the desired value.
Initialcatalogue:此前在示例ccr的步骤中创建的数据库的名称。
Initial catalogue: the name of the database created previously step for example CCR.
销毁容器是指删除通过lxc-create步骤与名称关联的配置文件和元数据
Destroying the container removes the configuration files and metadata associated with the name by the lxc-create step
通用步骤(没有任何名称)和While循环之间的路由包含与循环条件对应的逻辑。
The routing between the general step (with no name) and While Loop contains logic that corresponds with the loop condition.
这个例子通过两个步骤从Account进行导航,创建一个表示帐户所有者的名称的路径。
This example navigates from Account via two steps to create a path expression representing the name of an account's owner.
重复步骤19和20,创建三个以上具有如下名称的窗格。
Repeat steps 19 and 20 to create three more panes with the following names.
清单5展示了创建XML文档的dom树的代码,步骤与清单4非常相似,但其中的类和方法名称发生了变化。
Listing 5 shows code to create a DOM tree of an XML document, and the steps are very similar, even though the class and method names change.
目的地jndi名应当设置为在步骤6创建的队列的JNDI名称,而jaas别名应当设置为步骤1中的值。
The destination JNDI name should be set to the JNDI name of the queue created at step 6, and the JAAS alias should be set to the value from the step 1.
如果上面的步骤执行正确,那么结果中应该列出SAMPLED b数据源名称和IBMDB 2ODBC driver类型。
The SAMPLEDB data source name and of type IBM DB2 ODBC DRIVER should be listed if the above steps are performed correctly.
把名称改为LoanApplication,单击Next,然后按前面的步骤对资产进行分类。
Change the name to Loan Application, click Next and follow the earlier steps to categorize the asset.
应用推荐