• 数值计算表明土拓宽工程中,拓宽后路基变化率控制在0.25%能够满足路面功能性结构性要求

    Numerical analysis shows that the change rate of cross slop between new and old road been controlled at 0.25% can meet the functional and structural requirements of the road.

    youdao

  • 采取去掉办法改造抽油机游梁支架,节省大量钢材降低制造成本改造后的游梁支架进行了动态应力测试、位移测试稳定性计算。

    Through modification of the framework of a beam pumping unit by removing the cross tension link, a great quantity of steel can be saved and the manufacturing cost can be reduced.

    youdao

  • 采取去掉办法改造抽油机游梁支架,节省大量钢材降低制造成本改造后的游梁支架进行了动态应力测试、位移测试稳定性计算。

    Through modification of the framework of a beam pumping unit by removing the cross tension link, a great quantity of steel can be saved and the manufacturing cost can be reduced.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定